Scope of Work:

  • Reconstruction of approximately 2300 centerline feet of variable width existing roadway
  • Widening the roadway to allow on street parking – both sides
  • Replacing sidewalks and bringing curb ramps and crossings into ADA compliance
  • Upgrading and replacing approximately 2800 lf of storm sewer
  • Lowering water mains and replacing water services
  • Replacing sanitary services at conflicts with storm sewer
  • Centerline roadway re-profiling along with up to 18” of undercutting to replace unstable soils
  • Upgrading signage and pavement markings

Challenges to Overcome:

During the North Maple Street project, we faced several challenges that required innovative solutions and meticulous planning:

  • Site Access: Limited access to certain areas of the park made transporting materials and equipment challenging. Especially while performing deep undercutting of subgrade
  • Site Conditions: Preserving shallow existing utilities during undercutting operations and keeping residents in operations during utility relocations. Upgrading storm sewer sizing while holding relatively shallow inverts to meet existing downstream utility connections.
  • Community Impact: Ensuring minimal disruption to the residents and allowing 1 lane traffic during storm sewer removal and installation, deep base undercutting and driveway replacements
  • Environmental Considerations: Preserving existing Indiana Bat habitats, removing 20 large diameter trees before migration season started

In Conclusion: